What to measure on the site visit
A quote doesn't go wrong when you write it. It goes wrong on the visit, when nobody looked behind the wall.
4 min read · Updated
Twenty more minutes on the visit are worth more than two hours of calculating at home.
First: how you get in
Access before anything else. It eats the most hours and gets looked at the least:
- How close the van gets, and how many metres from there.
- Lift: whether there is one, whether the material fits, and whether building rules ban using it for works (they often do).
- The stairs: width, turns, and whether a bath or a boiler goes up them.
- Water and power on site: whether there is any, where from, and whether it works.
- Permitted hours in the building, and whether the managing agent needs telling.
A boiler that has to go up four floors by hand is two people and half a morning that appear in no line item.
What you measure and what you count
Measuring isn’t just the tape. Every visit has three kinds of data:
| Kind | Examples | How to record it |
|---|---|---|
| Lengths | metres of pipe, cable, skirting | with the tape, not by eye |
| Units | light points, radiators, windows, sockets | counted one by one |
| Conditions | what’s there now and what state it’s in | with a photo |
The third is what usually fails. People measure the metres and count the points, but nobody photographs the consumer unit — and then it turns out there’s no room for two more breakers.
The eight photos you always take
Whatever the trade, these eight prevent half the trouble.
- The access, from where the van parks.
- The general view of the room, from the door.
- What’s there now that’s being replaced, in full.
- The connections: valves, consumer unit, soil pipe, waste, gas point.
- What’s wrong and justifies a line: rust, damp, aluminium wiring.
- The ceiling or floor the services will run through.
- The awkward measurements, with the tape open in the shot.
- The data plate of whatever is being replaced.
The eighth saves the most time: with the model and the output in a photo, you never have to ring the customer to ask.
The five questions you can’t forget
- Who decides? If whoever opens the door isn’t whoever pays, the quote goes to both.
- When do they want it? Urgency changes the price, and you need to know before you write it.
- Are you buying the materials or am I? That’s the first exclusion in the quote.
- Will anyone be living here during the work? An occupied house is more hours and more care.
- Have you asked anyone else? Not to drop the price: to know whether this has to go out today or can wait until tomorrow.
And before you leave
Go through the list out loud, in front of the customer. Two minutes. That’s when the sentences that change the whole quote come out: “oh, and while you’re here, could you look at the kitchen tap?”
On the visit, that’s another line item. Halfway through the job it’s a favour you end up doing for free.
See how it works for heating and air conditioning engineers