What to exclude from a quote, in writing

Almost no argument at payment time is about the price. It's about what each side assumed, and that gets decided when the quote is written.

3 min read · Updated

Anything not written down, the customer assumes is included. And they’re right: you’re the one who knows the trade.

Why leaving it out costs money

A job that ends in an argument doesn’t end in a smaller invoice: it ends in a week of delay, in a customer who doesn’t recommend you, and sometimes in money you never see.

The exclusions paragraph takes four lines and is written once. It’s the highest-return part of the whole quote.

It isn’t distrust, it’s clarity

Some people leave it out because it feels like saying “I’m warning you now that I’ll charge extra.” The heading fixes that.

Instead of “Not included”, write “What this price doesn’t cover”, and put it where the customer reads it before accepting, not in the small print at the end. Nobody reads it and thinks “this one doesn’t trust me”: they think “this one knows what they’re doing.”

What to write every time

Three questions, and anything without a clear answer goes in exclusions:

  1. Who buys the materials the customer chooses? Tiles, taps, light fittings, shower tray. If they pick it, say so.
  2. Who puts the place back as it was? Making good, painting, filling chases and taking the rubble away are somebody’s hours.
  3. What happens if something turns up behind the wall? A rotten soil pipe or aluminium wiring wasn’t there at the survey.

By trade

Plumbing. Tiling and the shower tray the customer chooses; painting afterwards; rubble removal; whatever appears when the wall comes open.

Electrical. Chasing, filling and painting; decorative fittings the customer chooses; network operator fees; the certificate if an inspection asks for one.

Building work. Finish materials the customer chooses; the building notice and council fees; furniture and appliances; drawings or site supervision if they’re needed.

Heating and cooling. The builder’s work to run the lines; recovering the refrigerant from the old unit; the installation certificate.

Windows and metalwork. Making good around the opening; external painting and sealing; special glass if the customer changes their mind.

Landscaping. Water and power on site; permits for protected trees; plants the customer buys themselves.

How to word an exclusion that works

Poor: “Builder’s work not included.”

Good: “Filling the chases and painting afterwards isn’t included. If you want us to do it, that’s £320 extra.”

The difference is the second one gives a price. An exclusion with a price stops being an objection and becomes an option: half the time the customer says yes, and you’ve sold more without arguing about any price at all.

And then stick to it

A list of exclusions you don’t hold to is worse than none: if you end up doing three of the four things you excluded for free, the customer learns the list isn’t serious, and your next quote doesn’t get read.