Skip to content
Guides

How to quote windows and metal fabrication

In this trade the margin isn't lost on price: it's lost on measuring. One square metre miscounted across ten openings is your month's profit.

4 min read · Updated

In this trade a quote is a multiplication. And a multiplication is wrong all the way through if one of the two numbers is wrong.

Measure the opening, not the window that’s in it

The old window may have been there thirty years and not match the opening: rebates, a hidden sub-frame, or a floor that’s been built up.

What you write down for every opening:

  • Width and height, inside and out. If they differ, there’s a rebate and there’s more work.
  • Three widths (top, middle, bottom) and three heights. In an old building they’re almost never equal, and the smallest one wins.
  • Out of plumb: a straight edge or the level on both reveals. An opening out of plumb doesn’t get fixed with sealant.
  • Which way it opens, with the roller shutter and its box if there is one.
  • Wall thickness, which decides the trim and sometimes the system.

What actually moves the price per square metre

What gets chosen How much it changes
Thermal break the biggest jump in the quote
The glass (cavity, low-E, safety, acoustic) far more than the customer thinks
Colour: standard anodised or RAL powder coat a special colour costs more and adds lead time
Hardware and tilt-and-turn it shows most on small openings
Shutter: new box or reuse the existing one reusing is cheaper and sometimes impossible

Put it in the quote line by line, not in the total. A customer who sees what acoustic glass actually adds makes a decision; one who sees two totals compares.

The minimum square metre

An opening of 0.6 × 0.8 is 0.48 m², but making and fitting it isn’t half the work of a one-metre one. That’s why you bill a minimum per unit: usually between 1 and 1.5 m².

Leave it out and you’re doing the bathroom and the box room for free.

Replacement or full strip-out: not the same job

Over the existing frame: clean it, screw on top, trim it out. Fewer hours, less mess, less making good — and you lose a few centimetres of daylight.

Taking the old frame out: you have to chase it out, bed the sub-frame and make good inside and out. More hours and, above all, another trade: the making good is nearly always a builder’s job.

That decision is made on the survey and written down. And what isn’t included goes right next to it:

“Does not include making good around the opening or internal and external painting. External sealing is included.”

And the one that has cost the most money in this trade

Never order from the maker using the survey dimensions. You re-measure once the opening is prepared, with the old frame out if it’s coming out.

A wrongly ordered window can’t be returned: it’s made to measure and it’s yours. Checking the dimensions before ordering costs an hour; getting it wrong costs the whole opening and the lead time all over again.

That’s why the quote always carries the maker’s lead time, and why it expires when the supplier’s price list does: if aluminium goes up in April, the price you gave in January doesn’t exist any more.

See how it works for window and door fitters

Presupai does this for you

Talk through the job and it comes out written, with the line items and prices from your own price book. Fourteen days free, no card.

Try it free for 14 days